| Place of Origin: | Gunagdong,China |
|---|---|
| Brand Name: | meiyan |
| Certification: | CE,ROHS,ISO9001 |
| Document: | Meiyan Lighting Catalog.pdf |
| Minimum Order Quantity: | 200 |
| Price: | 1 dollars |
| Packaging Details: | transparent package, carton |
| Delivery Time: | 7-10 work days |
| Payment Terms: | T/T |
| Supply Ability: | 300000 pieces a month |
| Material: | Metal, Brass/copper/Carbon Steel/Iron/stainless Steel/Customized | Color: | Pearl Chrome/Nickel Plating/White/Black/Customized/Gold |
|---|---|---|---|
| Function: | Home.hotel.indoor,outdoor Lighting | Type: | In Stock, Easy Installation |
| Sample Availability: | Available | ||
| Highlight: | Anti-rust panel light suspension kit,Suspension kit with carabiners,Panel light carabiner suspension kit |
||
| Material | Metal, Brass/Copper/Carbon Steel/Iron/Stainless Steel/Customized |
|---|---|
| Application | Indoor, Outdoor, Panel Light/LED Strip Light/Plant Pot Hanging Light/Mining Light/Chandelier |
| Feature | Customized Length and anti-rust materials |
| Product Name | Anti-rust Suspension Kits with two Carabiners for Panel Light |
| Color | Pearl Chrome/Nickel Plating/White/Black/Customized |
| Usage | Lighting Accessory |
| Function | Home, Hotel, Indoor, Outdoor Lighting |
| Sample | Available |
| Size | Customized Size |
Are you a trading company or factory?
We are 100% factory and warmly welcome our customers to visit at any time.
Can I get free samples for specification confirmation before mass order?
Free samples are available for existing dimensions.
What about the lead time?
Samples need 5-7 days, mass production time needs 1-2 weeks after order confirmation.
What tests do you perform?
We conduct tensile tests for our wire rope cable assembly products and salt fog tests for other lighting accessory hardware such as cable grippers.
How to proceed with an order?
First, let us know your requirements or application.
Second, we quote according to your requirements or our suggestions.
Third, customer confirms the samples and places deposit for formal order.
Fourth, we arrange the production.